Last week I went to load a chimney section at 14m long so opened the trailer up 1 hole so it would sit superb.
Then another kid came out and says that we need to leave room at the back of the trailer, because the plan was to lift the chimney from one end on site (headboard end), so it sat on it’s base on the back of the trailer to lift off upright and into position.
Now the base was 1.5m square, and would mean opening upto 15.5/16m for them to do this.
As far as I’m aware this is ■■■■■■■■, and after much deliberation and crap from the people loading, it was loaded at 14m, lifted off on site and uprighted on the ground.
Am I right in thinking that you could possibly get done for this?