Diairy

started Thursday at 19.30
loaded Trailer and left Depot at 20.15
lost all Power on Engine at 21.05 on M1 between Junction 9 and 10
Motorway Maintenance arrived at 21.30 and phoned Recovery
Recovery arrived with two Trucks at 21.40
we left place about 22.10 to Teddington Station where Technician from South Mimm waited.
after Recovery Trucks left found he out that Plasticpipe in Tank was brocken und the last 80 liter Diesel were left in as Hose pulled through Cut Air,as Filter on end of Hose was broken away.
Told Technician at 02.20 friendly that he may phone ITS,as i have it busy,and he hadn’t Parts
ITS arrived at 03.15 and had Engine 10 minute later running.
another 10 minute to build Power axle together and i arrived Hub at 05.00.
usually arrival Time is 23.30.
NOW :laughing:
ITS-Man just gave me some Diesel,but couldn’t fix it as he hadn’t Parts with him.
in that Case be aware that i could stay again,maybe in Roadwork area

just stay away from there monday morning please Frank :smiling_imp:

David5l:
just stay away from there monday morning please Frank :smiling_imp:

But Monday Evening :wink: