last place i worked driving a 12ton underlift i had a load of my tools taken from the lockers during the day parked up in our own yard. i got sent out in a different truck to do one quick (30 minutes) job across town and my box had been gone thru and i lost multimeter, diagnostic machine and a spanner roll. boss said it was my own fault for leaving it in there. then used to regularly complain when i spent the first half hour of each shift loading all the tools from my van into the truck and the last half hour unloading them again