went to swiss for the first time last week no probs with customs or t forms went in to the check point at altdorf got weighed of and height ok then left about half hour before the gothard tunnel got pulled in again parked up for 40 mins then allowed to go is this something to do with the tunnel any info
Yep, it’s the way they control truck traffic flow through the tunnel, it’s been that way ever since the fire.
if you have a look on the sticky,s there is a link for the SWISS in English
which will help you out ,