There is currently a tempory weight limit in force on the M4 between J1 and J3 in BOTH directions.
It is a 17t weight limit and apparently it has to do with structural damage to the elevated section ( its a bit like the Hammersmith flyover aparently)
it is signposted but not very well at the moment as it only went in over the weekend.
However I cannot find anything about it in the press or higways web sites
as I get more info I will let you know
If any of you are members of other sites please feel free to repost this (if Barrie doesnt mind) to try and pass the word
Taken from another web site
i noticed saturday night
how’s with Olympia if they need to shut all roads down?
fingermissing:
it is signposted but not very well at the moment
e
Well it was on the matrix boards at the bottom of the m3 on sunday morning
billybigrig:
fingermissing:
it is signposted but not very well at the moment
e
Well it was on the matrix boards at the bottom of the m3 on sunday morning
On the boards on the M1 last night as well.
Coffeeholic:
billybigrig:
fingermissing:
it is signposted but not very well at the moment
e
Well it was on the matrix boards at the bottom of the m3 on sunday morning
On the boards on the M1 last night as well.
billybigrig:
fingermissing:
it is signposted but not very well at the moment
e
Well it was on the matrix boards at the bottom of the m3 on sunday morning
Read the bottom line of my o p
fingermissing:
Coffeeholic:
billybigrig:
fingermissing:
it is signposted but not very well at the moment
e
Well it was on the matrix boards at the bottom of the m3 on sunday morning
On the boards on the M1 last night as well.
billybigrig:
fingermissing:
it is signposted but not very well at the moment
e
Well it was on the matrix boards at the bottom of the m3 on sunday morning
Read the bottom line of my o p
I wasn’t replying to your post, I didn’t read it, I was replying to the one I quoted