A couple more photo’s from my collection
These were taken during a move of 10 abnormal loads from the docks at Warren Point to Derrylin
The largest load was @ 250 tonne gross weight and was pulled by the 6X6 Unipower and pushed by a Scammell contractor
My load was a 64 tonne section… @ 5 metres wide, carried on a 6 axle semi low loader
It took us, (Econofreight and Martrain transport) over 19 hours to do the move, it had to be done in one day as the RUC were not keen to park us up and come back to us next day…
this final photo shows the similar load to mine travelling down the road infront of me …