There has got to be a better way of shutting lanes then 800 600 400 200 then closed.Last night it took me
over hour and a half
on the M6 junction 4 to junction 6.The highways agency had put a
sign on the matric telling there was delays of 20 mins .Do they look at traffic or just throw a dart at a board
then what ever number it hits thats the umber they put up.
PS if i put my hazards light on dose that mean i can drive down the hardshoulder. This was said as a joke.