roping and sheeting

Spardo:

gazsa401:
I pick up this 20yd bin every 4 weeks it’s all off cuts of new Formica and similar types of materials
If I don’t sheet and rope it whilst it’s on the deck the majority of it would slide off and fall off when I pick it up
I just wondered what advice Mr CF would give me in the art of load restraint in doing it another way
The elastic bungee on the sheet is only there for keeping it in place and not for load restraint

Very dificult to do decent hitches that low down I would have thought, do you go round and redo them when you have it on board ?

It’s not too bad I’m still quite fit [emoji12]and agile I do get them tight as the consequences are half the load slides off the back if you don’t
9 times out of 10 they don’t need redoing but the odd one might do [emoji1303]